From eliminating residential electricity bills with Net Metering to providing 100% off-grid reliability for remote farms and powering industrial factories with 40% tax depreciation.
Compare On-Grid, Off-Grid, and Hybrid configurations to match your power requirements and budget.
Synchronized directly with the DISCOM grid (JVVNL/AVVNL) through a bi-directional Net Meter. Excess power generated during daylight is automatically exported to the grid for monetary credits.
Completely independent power station equipped with high-efficiency LiFePO4 Lithium-Ion or solar tubular batteries. Keeps running 24/7 even during prolonged grid blackouts or zero grid availability.
The flagship setup: provides Net Metering bill export savings while maintaining dedicated battery reserves for instantaneous (<10ms) uninterruptible power during grid outages.
| Feature | On-Grid Solar | Off-Grid Solar | Hybrid Solar |
|---|---|---|---|
| PM Surya Ghar Subsidy | Eligible (Up to ₹78,000) | Not Eligible | Eligible on Solar Part |
| Net Metering (Export Units) | Yes (Bi-directional) | No grid connection | Yes (Bi-directional) |
| Battery Storage | No Battery Needed | High-capacity LiFePO4 Storage | Integrated Smart Battery Storage |
| Power During Blackout | Shuts down for safety (Anti-Islanding) | Continuous 24/7 Power | Zero-switch (<10ms) Instant Backup |
| Approximate Payback Period | 3.0 - 3.8 Years | 5.5 - 6.5 Years | 4.5 - 5.5 Years |
| Ideal Application | Urban Residential & Commercial | Remote Homes, Farmhouses, Pumps | Hospitals, IT Hubs, Premium Villas |
From your first phone call to flipping the solar switch and receiving your subsidy.
Our engineers visit your site in Jaipur or Alwar for 3D shadow analysis, structural load testing, and exact bill audit.
AutoCAD 3D layout optimized for Rajasthan latitude and azimuth angles to generate peak units all 365 days.
We submit all documents, K-Number verification, and engineering drawings to JVVNL/AVVNL for technical approval.
80-micron hot-dip galvanized mounting structures, Hilti chemical anchoring, and Tier-1 TOPCon panels installed in 48 hours.
DISCOM inspection coordination and physical installation of the bi-directional solar net meter on your meter board.
Inspection signoff uploaded to National Portal. ₹78,000 subsidy credited directly to your bank account within 30-45 days.